Amsterdam / Delfzijl, 21 May 2026 – EemsGas – which, with an investment of over €100 million, is set to become one of the largest production facilities for biomethane (green gas) in the Netherlands – has received an SDE++ subsidy decision from the Rijksdienst voor Ondernemend Nederland (RVO). This provides an operating subsidy with a maximum value of €149.8 million. The subsidy provides EemsGas with guaranteed operating income over the next fifteen years. EemsGas is a 50/50 joint venture in which sustainable renewable biocommodities producer Perpetual Next and Gasunie have been collaborating since 2022 to produce large volumes of biomethane from demolition wood.
At the end of last year, EemsGas was already awarded a DEI+ investment subsidy of €30 million. This is earmarked for the construction of a green gas plant at the Chemiepark in Delfzijl. The SDE++ subsidy now awarded supports the production phase: it covers a minimum price for biomethane and thereby provides long-term certainty over operating income.
For the development of the plant, EemsGas partnered with TNO, the provider of the gasification technology. Equipped with leading-edge technology, the plant will produce 18 million cubic metres of green gas per year, far exceeding the output of conventional green gas production facilities.
Rene Buwalda, CEO of Perpetual Next: “Both subsidies not only demonstrate a substantial financial commitment from the Dutch government, but also underline the importance of this development for the energy transition and the competitive position of the Netherlands. The plant will make a significant contribution to our country’s energy independence and will furthermore meet the globally growing demand for biomethane.”
Hans Coenen, COO of Gasunie: “This commitment provides additional backing to make the deployment of gasification technology for the production of renewable fuels such as green gas a success. Sustainable molecules have an important role to play in our security of supply.”
The maximum subsidy amount of €149.8 million applies over a production period of fifteen years, from 1 July 2029 to and including 30 June 2044. The actual annual payment will vary in line with the market price for gas and serves as a price floor guaranteeing a minimum level of income over the full term.
In the period ahead, the plans for EemsGas will be finalised, so that construction of EemsGas can commence in 2027, with the facility due to become operational in 2029.
About Perpetual Next
Perpetual Next converts organic waste into high-value, renewable raw materials such as biomethanol – a sustainable alternative to fossil methanol. The company is building large-scale production sites in the Netherlands, Estonia and the United States, and is working on further international expansion, thereby accelerating the transition to a circular, climate-neutral economy. www.perpetualnext.com
About Gasunie
Gasunie is a European energy network company. In the Netherlands and northern Germany, we manage and maintain the infrastructure for the large-scale transport and storage of gas. At present, this is predominantly natural gas. With the energy transition, this will increasingly shift towards green gas and hydrogen. We also contribute to the construction and management of networks for heat and CO₂. As a 100% state-owned company, we ensure that this part of the energy supply is delivered safely, without interruption, and as sustainably as possible – so that everyone always has access to energy. www.gasunie.nl/projecten/eemsgas